cancel

Find Qualified
Local Contractors

Select Service:
Enter Zip:

community forums

Featuring over 100 topics of interest to DoItYourselfers.
Close Help

Help FAQ


Creating a Project:

  • Just go here and follow the simple instructions.

Updating/Modifying a Project:

  • You have a bunch of editing options available on your project page.
  • Just look for the edit icons. Edit Icon Click on them to change some text or swap out an image.

Uploading/Changing Photos:

  • You can Upload your own photos to to your project page. Images will be scaled down to 550x500 pixels.
  • Click change photo next to an image to swap it out for a new one.
  • Click remove photo next to an image to permanently delete that photo from your page.
  • Click Add a Photo add extra photos to your project page.

Reporting Inappropriate Content:

  • Click Flag as inappropriate and an email will be sent to our editing staff who will review the page immediately.
  • Just click report this next to a comment to let our editors know a review is needed.
Close Helpclose Help

Kitchen Remodel

Flag as inappropriate
  • Currently3.08/5 Stars
  • 1
  • 2
  • 3
  • 4
  • 5
out of 386 votes
Created: Nov 17, 2007 by Rick Johnston
Views: 3719


comments

Before

Before Photo

After

After Photo

Project Summary

We gutted a tiny galley kitchen and blew out half of the wall separating it from the dining room. There was a door in the kitchen that's now an over-sink window. There was a window in the DR that's now a sliding door that opens onto the deck. All work was done by my wife and me -- with help from my brother -- over a period of 6 weeks.

Two electrical circuits were added for a total of five (microwave, dishwasher, lighting and two appliance.) Three switch legs control the center light fixture, under cab puck lights, and the rope lights above the wall cabinets. The electrical wiring for the dining room light fixture also had to be re-routed because it originally ran down through the wall we removed.

Plumbing for the sink and DW was re-routed to the exterior wall.

Cabinets are semi-custom all-wood cherry. The countertop is about to get replaced with granite. The one in the picture is formica, and the bullnose is 1x2 oak, hand formed and stained. Due to budget constraints we re-used the ten-year old appliances. They will be replaced when the new countertops go in.

The original 2nd level deck was 4' x 4' -- too small for the 6-foot sliding door. We wound up building a new one and using the old one as a base for a gardening station.

Finally, we replaced the carpet and lino with oak parquet flooring.

Project Journal

There are no Journal Entries for this project

member comments

or Register to leave a comment.

If you have a question you would like answered, please visit our Community Forums.
posted Nov 27, 2007

Wow! I've noticed that the kitchen projects that have been submitted all accomplish a LOT at a very reasonable price. Am I to believe that contractor mark-up accounts for a huge chunk of the cost of most kitchen overhauls?! Job well done!lb

Tags for this project

No tags for this project.

Budget & Materials

Budget:
$6.000
Materials:
  • Cabinets sink faucet and countertops were $3k.
  • Material for moving the 2nd-story deck to the new door's location was roughly $800.
  • Sliding door & window were $1200.
  • Hardwood flooring was about $600.
  • Framing lumber drywall and miscellaneous materials made up the rest.

More Photos