cancel

Find Qualified
Local Contractors

Select Service:
Enter Zip:

community forums

Featuring over 100 topics of interest to DoItYourselfers.
Close Help

Help FAQ


Creating a Project:

  • Just go here and follow the simple instructions.

Updating/Modifying a Project:

  • You have a bunch of editing options available on your project page.
  • Just look for the edit icons. Edit Icon Click on them to change some text or swap out an image.

Uploading/Changing Photos:

  • You can Upload your own photos to to your project page. Images will be scaled down to 550x500 pixels.
  • Click change photo next to an image to swap it out for a new one.
  • Click remove photo next to an image to permanently delete that photo from your page.
  • Click Add a Photo add extra photos to your project page.

Reporting Inappropriate Content:

  • Click Flag as inappropriate and an email will be sent to our editing staff who will review the page immediately.
  • Just click report this next to a comment to let our editors know a review is needed.
Close Helpclose Help

Boys Bathroom

Flag as inappropriate
  • Currently3.02/5 Stars
  • 1
  • 2
  • 3
  • 4
  • 5
out of 557 votes
Created: Nov 22, 2007 by Familyzoo
Views: 4589


comments

Before

Before Photo

After

Project Still in Progress

Project Summary

5x8 bathroom
Tore out the walls and the ceramic tile floor. Replaced everything except the tub.

Replaced inward swinging door with pocket door, it was challenging to accomplish this without disturbing the drywall in the hallway. We had a knockdown texture on it and really didn't want to repair the wall.
Having little framing support on the bathroom side at the foot of the tub (because of the pocket door) was overcome by hanging the cement from the ceiling to floor in one sheet.
We have done all this work ourselves

Building and installing a linen closet and vanity soon

Project Journal

There are no Journal Entries for this project

member comments

or Register to leave a comment.

If you have a question you would like answered, please visit our Community Forums.

Tags for this project

Budget & Materials

Budget:
$2000
Materials:
  • Tile
  • cement board
  • plastic sheeting
  • new toilet
  • new light fixtures new ceiling fan
  • pocket door(kit)...
  • Pine lumber
  • Hammered copper sink- Pewtered
  • New faucets
  • New shower/tub plumbing

More Photos

Alternate Photo 1Alternate Photo 2Alternate Photo 3Alternate Photo 4

More Projects from Familyzoo